Commentary – Aaron Stene On the New Daniel K. Inouye Highway

The Central Federal Lands Highway Division and Hawaii Department of Transportation, among others, should be commended for their efforts to improve Saddle Road. The recently opened segment between m.m 41 and m.m 51.27, along with the previous phases (m.m 11 and m.m 41), is a huge improvement over the old Saddle Road.

The Daniel K. Inouye Highway opened this weekend.  Photo by Aaron Stene

The Daniel K. Inouye Highway opened this weekend. Photo by Aaron Stene

The latter roadway was riddled with potholes and serious design deficiencies, which caused an immeasurable number of accidents and fatalities.  In addition, the realignment and reconstruction of Saddle Road to a full fledged highway has resulted in a huge time savings in commute times.

I was able to drive between m.m six (top of Puainako Extension) and m.m 51.27 on the Kona side in 56 minutes. My overall time savings was about 26 minutes, so I can’t wait until the last east side Saddle Road phase is complete. It will reduce commute times even more.

Photo by Aaron Stene

Photo by Aaron Stene

I know there is challenges acquiring the right of way for the final SR200(3) phase. However, I’m confident these challenges will be overcome. It is imperative that Senator Dan Inouye’s legacy project is finished.

Aaron Stene

Kailua-Kona

Leave a Reply

Your email address will not be published. Required fields are marked *

I do this to keep the spammers away * Time limit is exhausted. Please reload CAPTCHA.